A house draws power in bursts — mornings, evenings, a pump, an air conditioner in the afternoon. Sizing a rooftop system to a monthly bill alone gets that wrong. We read your consumption pattern first, then design to it, which usually means a smaller and better-matched plant than a catalogue quote would give you.
Housing societies bring a different problem: common-area load, lifts and pumps, and capex shared across members. We handle those as one project with one point of accountability, so no member is left chasing a vendor.
Almost everything a homeowner worries about happens after the quote is signed. These are the commitments we make before it is.
One written quote with the make and model of every component on it. Nothing new appears later.
We prepare, submit and follow up the PM Surya Ghar application, and we do not charge separately for it.
Your system is designed around your roof, your shading and your consumption, not picked off a size chart.
Tier-one modules and inverters, named on the quote, with the manufacturer warranty registered in your name.
Hot-dip galvanised mounting engineered for local wind loads, because the roof has to hold it for decades.
Our own crews do the work, and the same team is who you reach after commissioning.
A complete system — panels, inverter, structure, wiring, installation and commissioning. The last column is the figure that leaves your account once the PM Surya Ghar subsidy is credited.
| Rooftop system | System cost | PM Surya Ghar subsidy | Your cost after subsidy |
|---|---|---|---|
| 3 kW | ₹1,89,000 – ₹2,15,000 | ₹78,000 | ₹1,11,000 – ₹1,37,000 |
| 4 kW | ₹2,52,000 – ₹2,85,600 | ₹78,000 | ₹1,74,000 – ₹2,07,600 |
| 5 kW | ₹3,15,000 – ₹3,57,000 | ₹78,000 | ₹2,37,000 – ₹2,79,000 |
| Above 5 kW | Quoted after site survey | ₹78,000 | Confirmed with your quote |
Four stages, all of them handled by us. You sign once.
A free visit, roof measurement and shading study, then a written proposal with honest generation numbers.
Subsidy registration and the DISCOM application filed in your name, tracked by us until sanctioned.
Structure, modules and inverter installed by our crew, then inspected and meter-changed.
Plant commissioned, monitoring handed over, subsidy claim followed through to your bank account.



A free site visit takes about forty minutes and commits you to nothing.