info@fourcellenergy.com
+91 6359333222 | +91 8200681694

Kishor Bhadani – 243.1 KW

Project Information

Fourcell Energy is proud to announce the successful installation of a 243.1 KW rooftop solar system for Kishor Bhadani, located at Rajmani Khandsheri Compound, Vill-Motaborsars, Kamrej, Surat, Gujarat.

As part of an industrial project, this large-scale solar installation reflects a strong step towards clean energy adoption. The system is designed to deliver substantial power savings while actively reducing carbon emissions.

This initiative underscores our commitment to delivering reliable, high-performance solar solutions that support a more sustainable and energy-efficient future.

Scope of Project

This project involved the complete design, supply, and installation of a 243.1 KW rooftop solar PV system.

Key highlights include:

1. Rooftop mounting of solar modules
2. Electrical integration into the existing infrastructure
3. Optimized layout for maximum solar generation
4. Project commissioning at an industrial facility in Kamrej, Surat

The system is engineered to ensure long-term reliability and performance, supporting Kishor Bhadani’s transition to renewable energy with lasting environmental and economic benefits.

Client

Kishor Bhadani

Location

Vill-Motaborsars, Kamrej, Surat, Gujrat

Category

Industrial Project

Energy Generation

243.1 KW

You may also want to have a look at similar projects.

Scan the code