We are proud to announce the successful implementation of a 75.35 KW rooftop solar power plant for Jay Bharat Fashion, located at Nirant Industrial Estate, Pipodra, Surat, Gujarat. This industrial-scale solar installation reflects the client’s commitment to sustainability and long-term energy efficiency.
The plant is designed to generate approximately 113,025 kWh of clean electricity annually, supporting major operational needs while reducing reliance on conventional power sources. With energy rates at ₹8 per unit, this project is set to save around ₹9,04,200 every year, offering both financial and environmental returns.
In addition, the installation contributes to an estimated 91,260 kilograms of CO₂ emission reduction annually—reinforcing Jay Bharat Fashion’s vision for a greener future.
This project involved the complete design, installation, and commissioning of a 75.35 KW solar photovoltaic system at Jay Bharat Fashion’s industrial unit. The key components of the project include:
1. Rooftop installation of high-efficiency solar panels
2. Integration with the existing electrical infrastructure
3. Installation of inverters, safety systems, and energy meters
4. Deployment of real-time monitoring systems for performance tracking